Mechanical room interior showing copper pipe risers climbing wall in parallel rows, each joint soldered clean, fluorescent light catching flux marks, hard hat and rolled drawings visible on shelf

Fig. 01 — Mechanical Room, District Installation

Copper risers · Soldered joints · Code-compliant routing

Campus PlumbingBuilt to Code,Delivered on Schedule,Bid-Ready Today.

From kindergarten bathroom retrofits to university lab gas line installations — we deliver board-formatted bid packages, coordinate shutdowns around your academic calendar, and close every job with full inspection documentation.

22YRS
Licensed & Bonded
140+DISTRICTS
School Clients Served
<4HRS
Emergency Response

CA LIC. #847291 · BONDED · INSURED · PREVAILING WAGE CERTIFIED

From Call to Closeout — Every Phase Documented

Hover each card to see what actually happens at that phase. No hidden steps, no surprise change orders.

Request a Bid Package →
01Phase 01

Scope Walk

Eyes on every pipe before a line is drawn

We walk the building with your facilities team before quoting anything.

HOVER FOR DETAILS →
Phase 01 — Detail

What we document on-site:

Every scope walk produces a photographic record organized by system — domestic water, sanitary, storm, gas.

  • Existing pipe material, diameter, condition
  • Shutoff valve locations & accessibility
  • Fixture counts by room and floor
  • Code conflicts flagged with photo reference
  • Asbestos or hazmat indicators noted
02Phase 02

Code Review

CPC, ADA, DSA — cited by section, not summarized

We cross-reference California Plumbing Code, DSA requirements, and local amendments before the bid is written.

HOVER FOR DETAILS →
Phase 02 — Detail

Codes we cross-reference:

Every applicable code section is cited in the bid package so your board's legal counsel can verify compliance independently.

  • California Plumbing Code (CPC) 2022
  • DSA requirements for K–12 & community college
  • ADA fixture count & accessibility standards
  • Local health department backflow rules
  • OSHPD requirements for lab gas systems
03Phase 03

Board-Ready Bid

Line-item format your procurement office expects

Our bid packages are formatted to match public agency procurement requirements — CSI divisions, alternates clearly separated.

HOVER FOR DETAILS →
Phase 03 — Detail

Bid package includes:

Formatted to match public agency procurement requirements — three-bid comparison ready.

  • CSI Division 22 format with section breakdowns
  • Material spec sheets with approved alternates
  • Labor hours by trade classification
  • Prevailing wage compliance declaration
  • Bonding & insurance certificates attached
04Phase 04

Shutdown Plan

Zero surprises on Monday morning

We coordinate every service interruption around your academic calendar — no shutdowns during finals, testing windows, or board meeting weeks.

HOVER FOR DETAILS →
Phase 04 — Detail

How we coordinate shutdowns:

Every shutdown window is pre-approved by your facilities director and documented in writing.

  • Academic calendar reviewed before scheduling
  • Shutdown duration estimated within ±2 hours
  • Temporary facilities arranged if needed
  • 48-hour confirmation notice to building staff
  • Single point of contact throughout outage
05Phase 05

Phased Installation

Buildings stay operational during construction

We sequence work to keep occupied wings of your building running while construction zones are isolated.

HOVER FOR DETAILS →
Phase 05 — Detail

Phasing approach:

No single phase takes more than one wing offline at a time — students and staff keep access to functioning facilities.

  • Wing-by-wing sequencing documented on drawings
  • Temporary connections maintain service continuity
  • Daily progress photos sent to project manager
  • Material staging in designated areas only
  • Cleanup to occupied-building standard daily
06Phase 06

Final Inspection & Docs

Closeout package ready the day of sign-off

We walk the final inspection with the building inspector and hand over a complete documentation package before we leave.

HOVER FOR DETAILS →
Phase 06 — Detail

Closeout package contains:

Your facilities file gets everything needed for the next maintenance cycle or capital project.

  • Signed inspection card & permit closeout
  • As-built drawings in PDF and DWG format
  • Fixture & equipment warranty cards registered
  • Maintenance schedule with service intervals
  • Emergency shutoff locations updated on floor plan

What We Build — Scope Summaries

Each project type has a standard scope structure. Click to see what's included before you call.

Request a Bid Package →
Modern institutional restroom with white porcelain fixtures and clean tile walls in school building
High Volume
K–12 Most Common

Restroom Renovation

Full fixture replacement, ADA compliance upgrade, supply & drain rough-in

  • //ADA fixture count per occupancy load
  • //Water-saving fixture selection & submittal
  • //Tile-ready rough-in with floor drain
  • //Flush valve & sensor upgrade
Industrial boiler room with large commercial heating equipment, pipes and gauges visible
Capital Project
Deferred Maintenance

Boiler Replacement

Hydronic boiler swap, gas line reroute, expansion tank, controls integration

  • //Boiler sizing per ASHRAE load calc
  • //Gas line capacity verification
  • //Expansion tank & relief valve sizing
  • //BAS integration wiring coordination
Close-up of industrial backflow prevention assembly with brass fittings and test cocks mounted on wall
Annual Cert
Code Compliance

Backflow Prevention

DCVA or RPZ installation, test & certification, health department submittal

  • //Assembly selection per hazard classification
  • //Annual test & cert program available
  • //Health dept. submittal package included
  • //Irrigation & lab isolation assemblies
University science laboratory with gas valves and piping at lab bench stations, safety equipment visible
Specialty
University & CTE

Lab Gas Systems

Natural gas, compressed air, vacuum, and specialty gas distribution for science labs

  • //NFPA 45 & CPC compliance by section
  • //Bench manifold & emergency shutoff design
  • //Pressure testing & documentation package
  • //Coordination with fume hood contractor

Additional Scope Types

Irrigation BackflowGrease Trap InstallationWater Heater PlantSewer Camera & LiningHydrant ReplacementMedical Gas (Nursing)Pool MechanicalStorm Drain Repair

Request a Bid Package

We format bid packages to match district procurement requirements — CSI divisions, prevailing wage declarations, and alternates clearly separated. Ready for your Tuesday board vote.

Bid turnaround in 5 business days
CSI Division 22 format standard
Prevailing wage certified
Emergency line: 1-800-555-0100

Emergency Response

Active water leak or gas event on campus?

1-800-555-0100

24/7 · <4 hr response

Bid Request Form — BID-2026All fields required

We respond within 1 business day to confirm receipt and next steps

MAINLINE PLUMBING, INC.

School District Plumbing Spec Sheet

PDF
CPC 2022ADADSAPrevailing Wage
Rev. 02/2026

Spec Sheet Includes:

  • Fixture count standards per occupancy type
  • Pipe material specifications by system
  • Code references: CPC 2022, DSA, ADA
  • Prevailing wage rate schedule (current)
  • Standard bid format — CSI Division 22
  • Emergency response protocol & SLAs
  • Sample closeout documentation package
  • Backflow assembly selection guide

Download Our School District Plumbing Spec Sheet

Eight pages of fixture standards, pipe specs, code references, and bid format guidance — written for facilities professionals, not general contractors.

No spam. One follow-up email maximum.